
Add to Cart
7.5kw Hydro Blaster For Ship Rust Removal High Pressure Water Blasting Machine
Details:
1. Power end crankshaft housing is made by the cast iron.it is stronger than the aluminium alloy.
2. Cross head is made by the Babbitt hard alloy.it has a long working life for industrial design.
3. Hydraulic end pump head is made by the hard alloy 40Cr.it can work continuously for cleaning jobs.
4. All hydraulic end is desgined for easy uninstall,so it is easy to fix when the parts broken.
5. For some outdoor use purpose,we can make it driven by the diesel engine or the gasoline engine.
6.Longer warranty time reach 2 years.
7.5kw Hydro Blaster For Ship Rust Removal High Pressure Water Blasting Machine
Characteristics as below:
MODEL | PRESSURE | WATER FLOW | POWER | Plunger Diameter | STROKE |
Bar | L/min | KW | mm | mm | |
LF-22/15 | 150 | 22 | 7.5 | 20 | 32 |
LF-18/25 | 250 | 18 | 7.5 | 18 | 32 |
LF-14/31.5 | 315 | 14 | 7.5 | 16 | 32 |
LF-12/40 | 400 | 12 | 7.5 | 14 | 32 |
LF-8/55 | 550 | 8 | 7.5 | 12 | 32 |
LF-5.6/70 | 700 | 5.6 | 7.5 | 10 | 32 |
LF-22/25 | 250 | 22 | 11 | 20 | 32 |
LF-18/32 | 320 | 18 | 11 | 18 | 32 |
LF-14/40 | 400 | 14 | 11 | 16 | 32 |
Product Description
High-pressure pump power input shaft must be with power output shaft center high equal, Connection mode is coupling.Power input power must be higher than the high pressure pump power rating,1450rpm, the rotary way must agree to the pump’s input end mark.
High pressure pump power input size as right shown, the input shaft coupling inside the area with the joint area should be more than 75%, The manufacturing precision of coupling should comply with the requirements, also should make dynamic balance test,In order to minimize the damage of high pressurepump vibration.
High pressure pump’s four fixing bolts should choose high strength grade which should be tightened when installation.
After the installation of the high pressure pump, turn the coupling with the hand, which should feel consistent, no resistance and squeak& rattle phenomenon.
Features
Operating process
Start the motor under the spray gun is closed and waiting the motor is working normally, and then begins other operation. At this time, the regulating valve is unloading. Run it for 5 minutes and examine the pump (whether it is normal), the pressure of the oil should between 0.3Mpa and 0.6Mpa.If its sound is normal and discharging media is not obviously fluctuating, we can put the trigger of the spray gun and regulate the pressure regulating valve to the requested cleaning pressure and then lock the nut, use the spray gun to clean towards the objects cleaned by the washer. At this time, spray gun is under the condition of high pressure jet.
When finishing the cleaning work , loose the trigger and unload the spray gun and meanwhile anti-clockwise loose the pressure regulating valve hand wheel and the main set operates under the condition of unloading and then stop.
GUARANTY OF QUALITY
We offer products of our own design and production and we guarantee it is high quality. A quality control of performed works is one of the main advantages of our Company. Important components of effective work: high qualification of our engineers, strict implementation of technical standards, application of quality materials, use of the most modern equipment and software.
Strict materials incoming (quality) control and acceptance tests
Laboratory and bench testing
100% compliance with technology, international standards
Application of the most modern high-tech QC tools
All manufactured equipment passes bench and field tests
International quality level
Positive feedbacks from our customers
It is extremely important for us that all our customers are 100% satisfied with the quality of our work!
INNOVATIVE AND TECHNOLOGY LEADER
Our mission is to continuously innovate, develop and offer the most efficient equipment for our customers.
Own design office
Technology Innovation Center
The of Companies employs more than 100 qualified and experienced engineers, designers and technicians
Own laboratory and test benches
Operative analysis and adjustment of design.
Applications
The pumps are widely used in oil refinery pipes cleaning, heat exchangers pipes cleaning, ship hull cleaing,oil paitings removing,rust removing,etc.
Meanwhile, our pumps also can be used for the fuel pipelines pressure testing,gas steel bottles explosion pressure testing,all kinds of the tubes pressure explosion testing, and so on.
Diesel Industrial High Pressure Washers High Pressure Washing Machine For Pipelines Cleaning,This equipment needs to use a backflush nozzle to go inside to the pipes.the nozzles should be smaller than the heat exchangers pipes.
when start the high pressure cleaning machine,the backflush nozzles can go into the pipes itself by the water jet push power.
then the nozzles water jet can clean the inside of the pipes.
As a 40 years manufacturing factory,we have many foreign customers who came to our factory to visit.
some of the photos as below:
Applications:
it is widely used in ship cleaning,oil removing,fuel pipeline cleaning in refinery fields.
some foreign customers give us comments below:
FAQ
7.5kw Hydro Blaster For Ship Rust Removal High Pressure Water Blasting Machine
Q1. What about the lead time?
A: 20 working days for mass production.
Q2. Do you have any MOQ limit for the product order?
A: Low MOQ, 1pc.
Q3. How do you ship the goods and how long does it take to arrive?
A: Ship by sea shipping.
Q4. How to proceed an order for the product?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly:we sign a contract
Fourthly We arrange the production.
Q5. Is it OK to print my logo on the product?
A: Yes. Please inform us formally before our production.
Q6: Do you offer guarantee for the products?
A: Yes, we offer 1 years warranty to our products.